Skip Navigation Links
 
Skip navigation links
SCHULER
Products
References
News
Career
Skip Navigation Links.
Consulting Tools 
Pfeil

Consulting tools necessary to achieve the selected optimization targets 

Modern instruments - adapted to the requirements of the woodworking and furniture industry

Working together with the customers, the SCHULER consultants develop concrete action plans after having analyzed the initial situation and provide their support in the implementation of these action plans. They apply carefully selected tools, best suited for achieving the selected optimization targets under the prevailing conditions. The "tool kit" contains the whole range of modern instruments - ideally adapted to the requirements of the woodworking and furniture industry.
Your benefits 
  • Our modern tools provide the basis for the successful implementation of action plans.
  • We have acquired an extensive know-how in handling these controlling tools and update our knowledge continuously.
  • The decisive success factor in projects is in addition to the tools, the awareness and motivation of your employees. This is obtained by the specific training of selected methods and actions. In this connection we also apply simulation games.

 

PfeilSCHULER Consulting Tools (Examples) 

Our tool kit is very extensive and contains for example:

  • Dynamic Simulation
  • Workshops for minimizing setup times
  • 3 S / 5 S
  • TPM
  • Machine Monitoring & Reporting
  • Poka Yoke
  • Value stream mapping
  • KPI systems
  • CIP
  • and much more ...


PfeilDescription of major consulting tools 


Simulation model furniture manufacturing



Multi Machine Monitoring

Dynamic Simulation  Machine Monitoring & Reporting (MMR) 
An individually designed simulation tool kit enables us to quickly model even complex manufacturing systems involving a reasonable effort. The simulation models may be fed with real manufacturing data and provide already in the planning phase reliable information on productivity and functional ability of a manufacturing system in the later operation.

The optimum utilization of machines and plants is one of the key success factors in manufacturing processes. Here SCHULER MMR comes with practical tools revealing existing potential in terms of time, performance and quality. For their development and consequently for a subsequent increase in performance, we elaborate individually coordinated action plans. Their impact can be monitored from the office workplace.

 


SCHULER KS



SCHULER PZE

KPI Systems  Staff work time logging SCHULER PZE 
For a state-of-the-art and performance-driven company management, the KPI-based systems and objectives constitute useful components for performance enhancement, wage calculation, capacity or utilization planning. We rely entirely on a systematic system which is based on target key performance indicators which are defined by applying the Gaussian Frequency Analysis.
The efficient staff work time logging SCHULER PZE reproduces highly complex interrelations, reduces significantly the effort involved in time logging at cost center level and time logging for single projects. The software is rapidly adjusted to the concrete operational conditions and is easy to operate.
 
 
Contact

SCHULER
Consulting GmbH

Karl-Berner-Strasse 4
72285 Pfalzgrafenweiler
Germany

Tel.: +49 7445 830-0
Fax: +49 7445 830-11
E-Mail



pdf